Unyte supplied a range of plant and equipment to assist in the removal and replacement of the Rail Bridge that spans the Goulbourn River bridge in Mooroopna.
The works were completed in a tight five-week program working under a rail occupation scenario.
Unyte’s scope of works involved:
Construction of access tracks for 700T Crane Construction of crane hardstands for 700T craneConstruction of 2 no retaining walls (104m and 64m long)
Removal of existing bridge abutment footings
Removal of existing ballast and disposal
Embankment widening and strengthening
Placement of railway capping and top ballast on up and down approaches