Wamarra was engaged to deliver the Dandenong Site Compound Set-up works on behalf of McConnell Dowell as part of the Cranbourne Line Upgrade for Western Program Alliance (WPA).
Project features included the design of temporary structure, covered walkways (556m2), a covered pre-start area (350m2), concrete paving (906m2) and access stairs and decking.
Wamarra provided design, management, trades and all materials to successfully complete the construction of the compound on schedule.