Wamarra was engaged to deliver the Dandenong Site Compound Set-up works on behalf of McConnell Dowell as part of the Cranbourne Line Upgrade for Western Program Alliance (WPA).
Project features included the design of temporary structure, covered walkways (556m2), a covered pre-start area (350m2), concrete paving (906m2) and access stairs and decking.
Wamarra provided design, management, trades and all materials to successfully complete the construction of the compound on schedule.
In the spirit of reconciliation, Symal acknowledges the Traditional Custodians of country throughout Australia and their continuing connection to land, sea and water. We pay respect to their Elders past, present and emerging and extend that respect to all Aboriginal and Torres Strait Islander peoples.
We acknowledge Aboriginal and Torres Strait Islander peoples as Australia’s First Peoples whose cultural practices continue today.
© 2020 Symal. All rights reserved.