Narrabri Turnback Facility

Project completion March 2021
Location Narrabri, NSW
Client Australian Rail Track Corporation
Sectors Transport, Rail infrastructure

Symal was awarded a major works package on the Murra Warra Wind Farm, located in a prime wind farm location in Victoria’s western district.

Our scope included the construction of 61 turbines (20m diameter) concrete foundations each incorporating 600m3 of concrete and 70 tonnes of steel per foundation.

  • Symal Infrastructure
  • | Civil construction
  • | Transport
  • | Rail infrastructure

Related projects

Interested in building a meaningful career?

If you're looking to build an exciting future, let's talk about the part you can play in creating a better tomorrow. Together, we can make amazing things happen.