Werribee Street Level Crossing Removal

Werribee, VIC
June 2020
McConnell Dowell (WPA)
SectorsTransport Infrastructure
June 2020
Werribee, VIC
McConnell Dowell (WPA)
Sectors
Transport Infrastructure

Site Establishment Carpentry

Wamarra was engaged to deliver the Site Establishment Carpentry works on behalf of McConnell Dowell as part of the Werribee Street Level Crossing Removal for Western Program Alliance (WPA).

Project features included the design of temporary structure, covered walkways (740m2), a covered pre-start area (290m2), concrete paving (225m2), timber decking (675m2), access stairs and ramps and handrails.

Wamarra provided design, management, trades and all materials to successfully complete the construction of the compound on schedule.