Wamarra was engaged to deliver the Site Establishment Carpentry works on behalf of McConnell Dowell as part of the Werribee Street Level Crossing Removal for Western Program Alliance (WPA).
Project features included the design of temporary structure, covered walkways (740m2), a covered pre-start area (290m2), concrete paving (225m2), timber decking (675m2), access stairs and ramps and handrails.
Wamarra provided design, management, trades and all materials to successfully complete the construction of the compound on schedule.
In the spirit of reconciliation, Symal acknowledges the Traditional Custodians of country throughout Australia and their continuing connection to land, sea and water. We pay respect to their Elders past, present and emerging and extend that respect to all Aboriginal and Torres Strait Islander peoples.